Piggly Wiggly


Piggly Wiggly, located on North Main Street, needed renovations done to their existing building. By utilizing the 4 in-house divisions of Sacon, they added new bathrooms and an expansion to the property.


Needs

  • Demolish existing block walls
  • Demolish back gutter to extend roof structure
  • Demolish double door unit in back area loading dock
  • Fill in new plumbing trenches
  • Supply and install block walls
  • Supply and install new dens glass sheathing
  • Supply and install new trim base and top molding
  • Prime and paint new sheetrock
  • Paint new block walls
  • Stam and poly new wainscoting
  • Epoxy paint in restroom 2 inches below ceiling
  • Supply and install gas lines for new HVAC units
  • Cut and remove asphalt for new concrete footers
  • Excavate for grease trap and drain pipe to sewer
  • Fill in new extended foundation with fill dirt and prep for concrete pour
  • Supply and install new concrete for restroom addition and loading dock expansions
  • Supply and install 2500 gallon grease trap with gasketed man hole covers
Share by: